🔨
ConstructionMURPHY · V2

Build-ops · QA · Milestones

MURPHY at his workshop bench🐿️

V2 · Construction Execution

MURPHY 🐕

The Mischievous Master Carpenter. Builds from REAPER's recovered materials and CDA's design — the homeowner's home takes shape. Chip 🐿️ hauls the offcuts.

Build-opsQAMilestones7-month cycle

The 7-month build cycle · MODELED

+10% footprint · +1 level · every cycle

Each rebuild grows the same home — the footprint expands 10% and a level is added, framed from the materials REAPER recovered. Five phase bands, governed milestone by milestone from the Custodian cockpit.

01~3 wks

Decon handoff & site

Recovered materials staged from REAPER · foundation prepped

02~9 wks

Foundation & framing

Footprint +10% · the new level framed

03~6 wks

Envelope

Roof, walls, windows — weather-tight

04~5 wks

MEP rough-in

Mechanical, electrical, plumbing

05~8 wks

Finish & QA

Punch list · efficiency score recorded

QA

Efficiency score · 0–100

Every job is scored on schedule, material yield, and rework — the orchestrator's self-learning signal on our own runs.

Live · shared ledger

Milestones →

The build's milestone board — the same rows the Custodian advances from the cockpit.

Live · shared ledger

QA pulse →

Efficiency scores as they're recorded, newest first.

In the value chain

Loan Pit → capitalREAPER → recovered materialsCDA → the designMURPHY → the buildVERA → verified

Calibrated projections, not quotes or a contract schedule. A licensed GC and inspector confirm what the model can only frame.